Claim Entitlements Calculator

Use this calculator to get an instant estimate of your delay related entitlements 

Your Name*
Email address*
Project Duration (in days) 
Days

Project Duration should include the mobilization period. Approved time extensions can be included only if approved and agreed to be without cost.

Total Contract Value

Including approved variations
In any currency

Contract finish date

As per contract

Expected / TOC/
or actual finish date

In cases where TOC was unjustifiably not awarded, please enter the date where the project was substantially completed (ready for beneficial use)

Total approved or Justifiable delays
 
Days
Preliminaires (non recurring) value
%

This % is the result of dividing the amount in the BOQ of the non-recurring preliminaries by the total contract value

% Nominal  Head office overheads
%

This % can be either as per tender or based on the end of year financial report (in which the average of the last 3 years is to be taken)

Liquidated damages
Per Day

As per contract

The intended purpose of this calculator is provide a rough estimate of the possible entitlements of the claimant. it is not intended to be a replace or supersede the need for a claims specialist. The use of any results from this calculator shall be at the sole responsibility of the user. 2p2c accepts no responsibility for the use or misuse of any information or results given herein.

Try again

Claim Entitlement Results

Delay Results

Project's Original Duratation
000
Project's Extended Duration
000

Calcuated as the difference between the TOC date and the contract finish date

Justified Delay
000

This is the extension of time that the client should be entitled to, and is the basis for prolongation cost calculations

Claimant's Culpable Delay
000

Name

Email

Claimant's Entitlements

Prolongation Costs
000

Calcuated as the difference between the TOC date and the contract finish date

Head Office Overhead Costs
000

Calculated based on the corrected Hudson formula (to eliminate the duplicate application of OH

Disruption Costs
000

Based on factor analysis - MCA-Labour Estimating Manual -1986, which assumes a loss of 16.25% of labor productivity due disruption factors. The total labor costs is assumed to be 10% of the total project costs.

This the Claimant's delay. Usually used to calculate the liquidated damages that may be applied.

Claimant's Risk

Liquidated Damages
000

Capped at 10% of the total contract value

The intended purpose of this calculator is provide a rough estimate of the possible entitlements of the claimant. it is not intended to be a replace or supersede the need for a claims specialist. The use of any results from this calculator shall be at the sole responsibility of the user. 2p2c accepts no responsibility for the use or misuse of any information or results given herein.