Claims Management

Claims are an inevitable fact in the construction business. Design changes, new authority requirements, revised specifications, or force majeure events, all of which may cause considerable delays and additional cost to the Contractor and hence give rise to claims. 

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram
Time-Out-got-the-first-look-inside-the-Museum-of-the-Future-main.jpg

Scope of Services

Thorough analysis and study of contract conditions (General and Particulars).

 

Forensic analysis of project supporting documents to identify valid delay events.

 

Analysis of variations in terms of quantum and possible time impact.

 

Performing a time impact analysis (TIA, Window TIA, or But-for)  using the available programme updates to quantify the delays in terms of critical delays and identifiable causes of delay.

 

A thorough and strategy oriented technical and contractual write up of the factual details of each delay event with reference to the associated delay outcome from delay analysis results.

 

Perpetration of Quantum claim in accordance with the delay analysis results and estimated variations.

 

Graphics
Abstract Linear Background
Red and Orange Gradient

Tools we use

FIDIC 1987, 1999, 2017

Primavera P6

Online document management systems (such as Aconex)

Artificial Intelligence 

 